Baniyas North Development Phase 3A and 3B
LOCATION Dubai, U.A.E CLIENT General Authority of Civil Aviation (GACA) CONTRACTOR SAFARI CMPANY CJSC AREA/QTY 1,000,000 m2 METHOD VIBRO-COMPACTION (Stone Column) COMPLETION DATE 30-12-2020 Living
Sheet Pile Shoring
Sheet Pile Shoring Process
Sheet piling retains soil, using steel sheets with interlocking edges and is applied using both vibratory and vibration-free installation rigs.
Sheet piles are strategically installed sequentially to reach the intended depth along the excavation perimeter or seawall alignment. These interlocking sheet piles serve as a resilient wall, offering lateral earth support, whether for temporary or permanent use, with the added benefit of decreased groundwater ingress. For scenarios demanding enhanced lateral support, options like anchors or internal bracing can be seamlessly integrated.
Two distinct choices exist for sheet piling:
To further reduce permeability, an interlock sealant can be applied to all forms of sheet piling, fortifying their resilience and effectiveness.
Advantages
LOCATION Dubai, U.A.E CLIENT General Authority of Civil Aviation (GACA) CONTRACTOR SAFARI CMPANY CJSC AREA/QTY 1,000,000 m2 METHOD VIBRO-COMPACTION (Stone Column) COMPLETION DATE 30-12-2020 Living
LOCATION ABU DHABI, U.A.E CLIENT General Authority of Civil Aviation (GACA) CONTRACTOR SAFARI CMPANY CJSC AREA/QTY 1,000,000 m2 METHOD VIBRO-COMPACTION (Stone Column) COMPLETION DATE 30-12-2020
LOCATION JAZAN, SAUDI ARABIA CLIENT General Authority of Civil Aviation (GACA) CONTRACTOR SAFARI CMPANY CJSC AREA/QTY 1,000,000 m2 METHOD VIBRO-COMPACTION (Stone Column) COMPLETION DATE 30-12-2020
LOCATION DAMMAM, SAUDI ARABIA CLIENT SAUDI ARAMCO CONTRACTOR HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD METHOD DYNAMIC COMPACTION STONE COLUMN COMPLETION DATE 30-03-2021
LOCATION JAZAN, SAUDI ARABIA CLIENT General Authority of Civil Aviation (GACA) CONTRACTOR SAFARI CMPANY CJSC METHOD VIBRO-COMPACTION (Stone Column) COMPLETION DATE 30-12-2020 The Jazan Airport