GeoHarbour Middle East

Bored Pile

Bored Pile 

Bored piles, representing an advanced and highly efficient construction element, find extensive use in diverse foundation and civil engineering projects. The strategic use of both temporary and permanent steel casings serves multiple engineering purposes, enhancing the structural integrity and reliability of these piles. 

Common Uses

  • Safeguarding Vertical Precision
  • Secant Pile Integrity
  • Enhanced Stability
  • Load Bypass
  • Temporary Support
  • Elevation Flexibility

Process

In the meticulous process of bored pile construction, steel casings are expertly introduced through techniques like rotation, oscillation, or vibration, ensuring precise placement. Specialized tools are employed to delicately remove soil, creating the void for the pile. Additional casing sections are joined and securely installed to the predetermined depth, meticulously prepared for the next phase. A full-length reinforcing steel cage is then carefully lowered into the precisely engineered borehole, fortifying the foundation’s structural integrity. The void is subsequently filled with concrete, solidifying the foundation’s strength. Once the pile is complete, temporary casings, having fulfilled their role, are meticulously extracted from the construction site.

Advantages

  • Robust Load-Bearing Capability

  • Effective Load Transfer

  • Stringent Verticality Precision

  • Diverse Diameter Range

  • Minimum vibration

Let's build together

Related Projects

Projects
geo_admin

Baniyas North Development Phase 3A and 3B

LOCATION Dubai, U.A.E CLIENT General Authority of Civil Aviation (GACA) CONTRACTOR SAFARI CMPANY CJSC AREA/QTY 1,000,000 m2 METHOD VIBRO-COMPACTION (Stone Column) COMPLETION DATE 30-12-2020 Living

Read More »
Projects
geo_admin

Ba Al Ghaiylam Development Project

LOCATION ABU DHABI, U.A.E CLIENT General Authority of Civil Aviation (GACA) CONTRACTOR SAFARI CMPANY CJSC AREA/QTY 1,000,000 m2 METHOD VIBRO-COMPACTION (Stone Column) COMPLETION DATE 30-12-2020

Read More »
Dynamic Compaction
geo_admin

Marjan Increment Program PKG6 Project

LOCATION DAMMAM, SAUDI ARABIA CLIENT SAUDI ARAMCO CONTRACTOR HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD METHOD DYNAMIC COMPACTION STONE COLUMN COMPLETION DATE 30-03-2021

Read More »