Baniyas North Development Phase 3A and 3B
LOCATION Dubai, U.A.E CLIENT General Authority of Civil Aviation (GACA) CONTRACTOR SAFARI CMPANY CJSC AREA/QTY 1,000,000 m2 METHOD VIBRO-COMPACTION (Stone Column) COMPLETION DATE 30-12-2020 Living
CCC
CCC Process
Unreinforced Concrete Column (CCC) inclusion is a creative and innovative ground improvement solution that integrates both low deformation modulus and rigid inclusions within compressible clayey soils. ompressibility. This technique is widely used in the areas of the close proximity of the existing services and sensitive structures due to the absence of vibrations due to its construction. The CCC achieves both settlement and bearing capacity requirements for the ground improvement projects.
The purpose of Controlled Concrete Columns (CCC) is mitigating foundation settlement and achieving bearing capacity requirements helping achieve structural stability. It also minimizes the risk of direct lateral impact on rigid inclusions resulting from post-construction activities. The process unfolds as follows:
This comprehensive process synergizes to achieve the objectives of CCC, providing enhanced foundation stability and reducing the risk of settlement.
LOCATION Dubai, U.A.E CLIENT General Authority of Civil Aviation (GACA) CONTRACTOR SAFARI CMPANY CJSC AREA/QTY 1,000,000 m2 METHOD VIBRO-COMPACTION (Stone Column) COMPLETION DATE 30-12-2020 Living
LOCATION ABU DHABI, U.A.E CLIENT General Authority of Civil Aviation (GACA) CONTRACTOR SAFARI CMPANY CJSC AREA/QTY 1,000,000 m2 METHOD VIBRO-COMPACTION (Stone Column) COMPLETION DATE 30-12-2020
LOCATION JAZAN, SAUDI ARABIA CLIENT General Authority of Civil Aviation (GACA) CONTRACTOR SAFARI CMPANY CJSC AREA/QTY 1,000,000 m2 METHOD VIBRO-COMPACTION (Stone Column) COMPLETION DATE 30-12-2020
LOCATION DAMMAM, SAUDI ARABIA CLIENT SAUDI ARAMCO CONTRACTOR HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD METHOD DYNAMIC COMPACTION STONE COLUMN COMPLETION DATE 30-03-2021
LOCATION JAZAN, SAUDI ARABIA CLIENT General Authority of Civil Aviation (GACA) CONTRACTOR SAFARI CMPANY CJSC METHOD VIBRO-COMPACTION (Stone Column) COMPLETION DATE 30-12-2020 The Jazan Airport