Seacant Pile Shoring

Seacant Pile Shoring Process

A Secant Pile Wall ingeniously assembles overlapping (secant) piles to create robust structural or cutoff walls, ensuring the essential water-tight integrity. For added strength, the design seamlessly integrates steel bars or beams as reinforcement, and should the need arise, supplementary anchors can be introduced to bolster lateral support.

Secant pile walls embody a dynamic blend of reinforced and non-reinforced piles. The initial installation typically involves non-reinforced piles crafted from cement or bentonite, providing structural stability. Subsequently, reinforced piles come into play, reinforced using cages, I-beams, or H-beams to further enhance structural integrity.

In scenarios where secant pile walls rely on anchors or a strutting system, they are often supplemented with a waler beam. This beam serves a dual purpose: it evenly distributes loads, preventing the anchor/strut from piercing through the piles, and serves as a contingency measure in the improbable event of an anchor or strut not bearing the load. The waler beam can be skillfully constructed as a reinforced concrete beam, cast adjacent to the pile wall, or via the utilization of steel profiles firmly affixed to the piles and the anchor/strut system.

Common Uses

  • Reinforce Slope Integrity
  • Facilitate and Secure Excavation Activities
  • Bolster Bulkhead Structures
  • Establish Effective Water Isolation

Advantages

  • Structural Integrity
  • Adaptability
  • Minimal Settling
  • Heavy Load-Bearing
  • Reduced Vibration

Let's build together

Related Projects

Projects
geo_admin

Baniyas North Development Phase 3A and 3B

LOCATION Dubai, U.A.E CLIENT General Authority of Civil Aviation (GACA) CONTRACTOR SAFARI CMPANY CJSC AREA/QTY 1,000,000 m2 METHOD VIBRO-COMPACTION (Stone Column) COMPLETION DATE 30-12-2020 Living

Read More »
Projects
geo_admin

Ba Al Ghaiylam Development Project

LOCATION ABU DHABI, U.A.E CLIENT General Authority of Civil Aviation (GACA) CONTRACTOR SAFARI CMPANY CJSC AREA/QTY 1,000,000 m2 METHOD VIBRO-COMPACTION (Stone Column) COMPLETION DATE 30-12-2020

Read More »
Dynamic Compaction
geo_admin

Marjan Increment Program PKG6 Project

LOCATION DAMMAM, SAUDI ARABIA CLIENT SAUDI ARAMCO CONTRACTOR HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD METHOD DYNAMIC COMPACTION STONE COLUMN COMPLETION DATE 30-03-2021

Read More »
top

Please Fill out form to Download Document

Please enable JavaScript in your browser to complete this form.
Name
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors